TerraEnerG Solar Systems All Systems Product Performance Guarantee AMC & Support Financing Size Guide Case Studies
Rated 5/5 on PM Surya Ghar TerraEnerG rating on PM Surya Ghar: 5 out of 5 from 28 reviews, 105 kWp installed, 27 installations
TerraEnerG 8K

Power for a Big Home — Without Waiting on a Subsidy

8 kW Rooftop Solar for Bangalore Homes

A complete 8 kW solar system for homes that run heavy loads — 3 or more ACs, an EV, or both. Minimum 9,600 units guaranteed every year for 5 years — your system is built to do more. Plus zero maintenance cost for 5 years: any repair or replacement is completely free to you.*

All-Inclusive Price
₹3,99,000
No subsidy to apply for
Estimated Payback**
~6 Years
Talk to a Solar Expert
9,600 Units/Yr
Minimum, guaranteed for 5 years
ZERO Cost
All repairs & replacements, 5 years
Up to 25 Yrs
AMC support available

*Excludes damage from events outside our control — lightning, flood, theft, and similar. Full list in the Generation Guarantee Terms.
**If every unit offsets a ₹7 tariff, at the guaranteed minimum generation. An estimate, not a guarantee. See the working.

8 kW rooftop solar array on a villa at Adarsh Palm Retreat, Bellandur, Bengaluru
⚡
9,600 Units
Guaranteed / Year
💰
₹8/Unit Payout
If we fall short
📡
24/7 Monitoring
Of your plant
⭐
5.0 / 5 Rating
28 reviews on PM Surya Ghar
🏠
500+ Installs
Across Bengaluru
Verified by the Government of India

Rated 5/5 on PM Surya Ghar

28 real customer reviews on the official Ministry of New and Renewable Energy portal — not a testimonial we wrote ourselves.

TerraEnerG rating on PM Surya Ghar: 5 out of 5 from 28 reviews, 105 kWp installed, 27 installations

Search "Terra Energy" → Karnataka → Bengaluru Urban on the PM Surya Ghar portal to verify.

The Product Philosophy

Solar isn't about what's printed on the equipment.

Most solar companies sell you a list: panels, inverter, structure, cables, installation. We think you should be buying something simpler — performance.

TerraEnerG 8K is one complete solar product. We design it, install it, and support it — so you don't have to pick components or compare brands. We take full responsibility for how well it performs.

Components are inputs. Performance is the product.
The Big Promise

At Least 9,600 Units. Every Year.

9,600 units is our minimum guarantee for each of the first 5 years. Your system is designed to generate more — this is the floor, not the target.

YearGuaranteed Generation
Year 19,600 units
Year 29,600 units
Year 39,600 units
Year 49,600 units
Year 59,600 units
48,000 units guaranteed over 5 years
Fall short? We pay you.

If your system makes less than 9,600 units in a year, you get ₹8 for every missing unit. Paid automatically, every year, between January and March. No forms, no claims.

Anything breaks? We fix it. Free.

Any repair or replacement your system needs in the first 5 years is completely free — parts and labour, zero cost to you.* This is a real commitment, not a marketing line.

*Excludes damage from events outside our control (lightning, flood, theft, and similar) — full terms on the Generation Guarantee page.

How does the generation guarantee work? →
One Product. One Price. One Responsibility.

Everything You Need. One Purchase.

8 kW complete solar system
System design and engineering
Installation
Commissioning
5-year generation guarantee
5-year comprehensive maintenance, incl. 24/7 monitoring
App-based generation tracking
Process/documentation support as applicable
Long-term AMC support options
Financing available, up to 10 years
Not included: your BESCOM meter. You pay for BESCOM meters at actual billed price from BESCOM.
Price

Everything You Need. ₹3.99 Lakh.

One price, paid once. There is no subsidy to apply for, no waiting for it to be credited, and no risk of it being rejected.

System price
₹3,99,000
Government subsidy
Not applicable
Total investment
₹3.99 Lakh
Want to pay over time instead? See financing options →
Why No Subsidy

Above 5 kW, Skipping the Subsidy Can Cost Less.

The PM Surya Ghar subsidy is capped at ₹78,000, however large the system. It also requires DCR panels, which typically cost about ₹12,000 more per kW. The bigger the system, the more that premium outweighs the subsidy.

Lower upfront cost
At 8 kW, the DCR panel premium is about ₹96,000, against a maximum subsidy of ₹78,000. Non-DCR panels bring the price down by more than the subsidy would.
No waiting, no rejection risk
With subsidy, you pay in full and wait for it to be credited, and it can be rejected. Here you pay once and the system is yours.
Better export rate
Non-subsidy systems earn ₹3.8 per exported unit, against ₹2.2 for subsidy systems.

The ₹12,000 per kW difference is typical, not fixed, and panel prices change. At 5 kW and below, subsidy usually works out better, which is why TerraEnerG 3K and 5K are subsidy systems.

Compare with TerraEnerG 8K, with subsidy →
Payback

How Fast Does 8K Pay for Itself?

It depends on how you use the power. Units used at home offset your ₹7 tariff. Units exported earn ₹3.8. BESCOM no longer banks units, so size for your own use.

ScenarioUnits a yearWorth a yearPayback
Guaranteed minimum, all used at home9,600₹67,200~5.9 years
Typical output, all used at home10,560₹73,920~5.4 years
Guaranteed minimum, all exported9,600₹36,480~10.9 years

Estimates, not guarantees. Typical output is 110 units per kW per month, the average across about 30 of our installations. Assumes a flat ₹7 tariff and no panel degradation, and ignores financing costs.

Work out the right size and payback for your bill →
Five Years of Maintenance

Zero Maintenance Cost. For 5 Full Years.

Installation is just the start. For 5 years, we watch, maintain, and repair your system — and any repair or replacement it needs is completely free to you.* We catch problems before you'd even notice them.

📡
24/7 Plant Monitoring
Your system's performance is watched continuously.
🛠
Automatic Engineer Deployment
A service engineer is dispatched the moment the system alerts a major fault.
🔍
Preventive Maintenance
Scheduled system inspections and health checks.
📈
Performance Monitoring
Tracked against your generation guarantee.
📱
App-Based Generation Tracking
See exactly how many units your system is producing, day by day, from your phone.
See What's Covered Under AMC →
After Year 5

Your 5-Year Guarantee Ends. Your System Doesn't.

Solar panels slowly generate a little less power each year — that's normal. So every 5 years, we lower the guaranteed number by 5% and guarantee it fresh, for another 5 years. Renew your AMC, and your generation guarantee renews with it. Skip the renewal, and the guarantee simply doesn't continue — the numbers below become long-term projections instead.

Years 1–5
9,600
Guaranteed
Years 6–10
9,120
Projected
Years 11–15
8,640
Projected
Years 16–20
8,160
Projected
Years 21–25
7,680
Projected
~216,000 projected units over 25 years

These numbers become guaranteed again each time you renew your AMC. Without renewal, they're projections, not guarantees. Actual generation depends on sunlight, shading, and site conditions.

See Our 25-Year AMC & Support Plan →
25-Year Product Journey

A 25-Year Solar Plan. Not a 5-Year Promise.

Years 1–5
Performance Guarantee
9,600 units/year guaranteed. 5-year comprehensive AMC included.
Years 6–10
AMC Renewal
Continue professional maintenance and support.
Years 11–15
AMC Renewal
Continue long-term system support.
Years 16–20
AMC Renewal
Continue long-term system support.
Years 21–25
AMC Renewal
Continue long-term system support.
Explore AMC & Long-Term Support →
Is 8 kW Right for You?

Is TerraEnerG 8K Right for Your Home?

TerraEnerG 8K is a good fit if you have:

An independent house or villa
About 520–560 sq ft of shadow-free rooftop space
A monthly electricity usage of about 800–850 units
3 or more ACs, or a home EV charged at home
A want to cut your dependence on grid power without waiting on a subsidy
Don't know what size you need?

Your electricity bill matters more than your house size. If your usage is lower, TerraEnerG 8K may suit you better; if it is higher, look at our 10kW system — or fill in the form and one of our executives will call you.

Size it yourself with our capacity calculator →
How It Works

Going Solar Is Simpler Than You Think

1
Tell us about your home
Share your location, electricity bill and basic property details.
2
We assess your requirement
We evaluate your consumption and rooftop suitability.
3
We design your TerraEnerG 8K
We engineer the complete system around your site.
4
We install & commission
Our team installs and commissions your system.
5
Start generating
Your system begins producing electricity.
6
We stand behind the performance
Your 5-year generation guarantee and maintenance commitment apply per the agreed terms.
Real Installations

Built for Real Indian Homes.

From Our Own Installations

We Measure What Makes a Solar System Generate More.

Real generation data from 5 kW and 3.7 kW plants in Bengaluru, compared side by side. Raised vs flush structures, and reflective roof coating vs none.

Read our case studies →
Why TerraEnerG 8K

Why TerraEnerG 8K?

Performance-led
We sell the system based on what it delivers, not a shopping list of components.
Clear economics
One defined product price with subsidy clearly explained.
Performance commitment
9,600 units/year guaranteed for five years.
Maintenance included
Five years of comprehensive maintenance, with 24/7 monitoring.
Long-term support
AMC support available beyond the initial five years.
Single point of responsibility
One company responsible for designing, installing and supporting your solar system.
FAQ

Frequently Asked Questions

TerraEnerG 8K is priced at ₹3,99,000 all-inclusive. It is a non-subsidy system, so there is no subsidy to apply for and the price is what you pay.

TerraEnerG 8K guarantees a minimum of 9,600 units per year for the first 5 years. Across our installations, systems average about 110 units per kW per month, which for 8 kW is roughly 10,560 units a year.

The PM Surya Ghar subsidy is capped at ₹78,000 and needs DCR panels, which typically cost about ₹12,000 more per kW. At 8 kW, that extra panel cost (about ₹96,000) is more than the subsidy. So 8K uses non-DCR panels and is priced lower upfront, with no subsidy wait and no risk of rejection. Actual panel prices vary.

Yes. Non-subsidy systems earn ₹3.8 per exported unit against ₹2.2 for subsidy systems. BESCOM does not bank units any more, so the best value still comes from using your own power.

If every unit offsets a ₹7 tariff, about 5.9 years at the guaranteed 9,600 units, or about 5.4 years at a typical 10,560 units. These are estimates that assume a flat tariff and no degradation. They are not a guarantee.

It is sized for homes using about 800–850 units a month. As a guide, each ton of AC adds about 120 units a month at 8 hours a day, and an EV charged once a week adds its battery kWh × 30 ÷ 7. Our capacity guide works this out for you.

About 520–560 sq ft of shadow-free space.

Yes. The price is all-inclusive — system, design, installation and commissioning.

No. Your BESCOM meter is charged separately, at actual billed price from BESCOM.

Yes — financing up to 10 years is available through Jan Samarth or NBFC partners. See our financing options for a full comparison.

If your system generates less than 9,600 units in a year, you are paid ₹8 per missed unit, automatically, every year. See the full Generation Guarantee terms.

Generation continues on a projected basis (5% lower every 5 years), and AMC can be renewed in 5-year periods for continued maintenance support and a renewed guarantee.

Ready to See What Solar Can Do for Your Home?

Get your free TerraEnerG 8K assessment. We'll check:

Electricity consumption
Rooftop suitability
Expected generation
Subsidy eligibility
System suitability
Takes less than 2 minutes. We'll get back to you shortly.
✓

Thank you — we've received your details.
One of our solar experts will call you shortly.